Location:Home > Engineering Case
Engineering Case
竞技宝|下载
The Tower Yoke Mooring Platform will be installed at the BZ25-1/S oil field in Bohai Bay, approximately 150 kilometers southeast offshore from Tanggu Port.
Orient Cable’s work scope for this project include two 35kV MV bridle cable and two bridle umbilical to provide the essential electric power, signal and air transmission link between the Floating Production Storage and Offloading (FPSO) vessel and single point mooring(SPM).
Orient also supplied the umbilical connectors and the connecting structures.

The Tower Yoke Mooring Platform will be installed at the BZ25-1/S oil field in Bohai Bay, approximately 150 kilometers southeast offshore from Tanggu Port.
Orient Cable’s work scope for this project include two 35kV MV bridle cable and two bridle umbilical to provide the essential electric power, signal and air transmission link between the Floating Production Storage and Offloading (FPSO) vessel and single point mooring(SPM).
Orient also supplied the umbilical connectors and the connecting structures.

Orient Cable’s work scope for this project include two 35kV MV bridle cable and two bridle umbilical to provide the essential electric power, signal and air transmission link between the Floating Production Storage and Offloading (FPSO) vessel and single point mooring(SPM).
Orient also supplied the umbilical connectors and the connecting structures.

